.
Search
 
 
   
Global Locations
         
  MGA Featured Items   MGA News
   
   

 We are happy to announce that our installation of the full-scale crash facility at PATAC is underway. PATAC is a 50-50 joint venture between GM (General Motors) and SAIC (Shanghai Automobile Industry Corporation).

The facility, located in Shanghai, China, will consist of two impact sites: the rigid barrier and the side/rear impact site.

There will be photographic pits at each area. We will continue to update our readers over the next few months on PATAC’s progress.

Track From Center to Start Room

These photos show the foundation that will support the test track. The guide rail system will be installed on top of this foundation.

Track From Center to Barrier

The rigid barrier foundation is 4 meters below the track surface.

Rigid Barrier and Front Pit

The area located in the middle of the test track will be used for side and rear impacts.

Center Side/Rear Impact Area

 
 
 
Life cycle >>  Evaluations simulate a product's life-time usage in a compressed time frame. Product performance over a lifetime is critical to your customer's perception of quality.
 
 
Lithium Battery Regulations>>  To be enforced starting January 1st, 2008, the only way to ensure that you are compliant with the regulations is to have your product tested.
 
 
216 >>   Roof Crush Resistance is a government-regulated safety standard established to "reduce deaths and injuries due to the crushing of the roof into the occupant compartment in rollover crashes".
.
  This is MGA I Engineering Services l Industries Served l Global Locations and Contacts I Sitemap  
© 2008 MGA Research Corporation, Tel:  +1-888-MGA-LAB1